The refurbishing process takes place in the industrial zone Radinovo near Plovdiv.

recycle-process-2

 

recycle-process-3

Check the general conditions and repair planing.

 

recycle-process-4

Check of the engine - exhaust gases.

recycle-process-5

Check of the engine - compression.

recycle-process-6

Dismantling of the machine.

recycle-process-7

 

recycle-process-8

Dismantling of the engine.

recycle-process-9

Dismantling of the mast, the cabin, wheels load axle and wheels steer axle.

recycle-process-10

Dismantling of engine and hydrostatic drive.

recycle-process-11

Dismantling of the hydrostatic transmission.

recycle-process-12

Sealing of all hydraulic components.

recycle-process-13

Repairing and sealing hydraulic distributor.

recycle-process-14

Sealing of the hydrostatic drive.

recycle-process-15

Maintenance of ignition and gas installation.

recycle-process-16

Dismantling of the engine.

recycle-process-17

Overhauling of the engine - if necessary.

recycle-process-18

 

recycle-process-19

 

recycle-process-20

Repairing of the fork carriage and coupling devices.

recycle-process-21

 

recycle-process-22

Mast repairingand etc.

recycle-process-23

Check of the wheels steer axle.

recycle-process-24

 

recycle-process-25

Repairing and sealing.

recycle-process-26

Painting preparation and panting.

recycle-process-27

 

recycle-process-28

 

recycle-process-29

 

recycle-process-30

 

recycle-process-31

Painting of all parts.

recycle-process-32

 

recycle-process-33

Assembling preparation.

recycle-process-34

Assembling of the engine and hydrostatic transmission.

recycle-process-35

Assembling and installation preparation.

recycle-process-36

 

recycle-process-37

 

recycle-process-38

 

recycle-process-39

 

recycle-process-40

 

recycle-process-41

 

recycle-process-42

 

recycle-process-43

Installation of the mast.

recycle-process-44

8 hours required testing of finished refurbishing process machines.